|
||
| THEMIS Magnetometer Installation at Carson City | ||
![]() |
||
| Once the magnetometer sensor was correctly aligned (see previous slide), we placed the magnetometer sensor cable in the trench and filled in the trench. Once filled, we placed rocks over the cable so that it would be clear where the cable was located. These rocks can be seen above to the right of the pipe conduit box and the GPS receiver on the black pipe. | ||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 |
||
![]() |
![]() |
|