|
||
| THEMIS Magnetometer Installation at Carson City | ||
![]() |
||
| Next David secured the magnetometer by placing duct tape around the joint of the sealed sensor pipe (black pipe on bottom) and the open pipe (black pipe on top). This is done to ensure that water does not get into the sensor. | ||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 |
||
![]() |
![]() |
|