|
||
| THEMIS Magnetometer Installation at Carson City | ||
![]() |
||
| Above is shown the trench looking approximately to the East. It meets up with the pipe conduits where the cables have already been fed through to the observatory. The observatory can be seen behind David, Gerald, and Terry (from left to right). Carson City can be seen in the distance. | ||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 |
||
![]() |
![]() |
|