THEMIS Magnetometer Installation at Carson City
  Gerald in the observatory holding the yellow rope  
  Gerald is inside the observatory un-taping the rope from the cables that were pulled through the pipes from outside to inside. These cables were later connected to the computer and magnetometer electronics.  
<< First | < Prev 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10
11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20
21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31
Next > | Last >>
CSE @ SSL SEGWAY Sun-Earth Connection Education Forum

THEMIS E/PO HOME | MISSION SCIENCE | NEWS & EVENTS
IN THE CLASSROOM | GALLERY & ACTIVITIES | ABOUT US

CONTACT US | ©2004 UC REGENTS