|
||
| THEMIS Magnetometer Installation at Carson City | ||
![]() |
||
| Here we are helping the GPS wire and the Magnetometer cable into the conduits as Gerald pulls the wire and cable using the yellow wire from inside the observatory. The entire process of having an existing wire conduit is probably unique to Carson City. Most other installations have shallow trenches where the wires are buried. | ||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 |
||
![]() |
![]() |
|