THEMIS Magnetometer Installation at Carson City
  Picture of the hole in the ground with wires  
  We walked to inside the fenced area to the location of the opening of the wire conduit. We are facing East now, looking down at the hole and wires. The yellow cord was used to pull the wires through from the installation area to inside the building. But first we had to put the wires underneath the concrete opening seen above. This was our first digging experience.  
<< First | < Prev 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10
11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20
21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31
Next > | Last >>
CSE @ SSL SEGWAY Sun-Earth Connection Education Forum

THEMIS E/PO HOME | MISSION SCIENCE | NEWS & EVENTS
IN THE CLASSROOM | GALLERY & ACTIVITIES | ABOUT US

CONTACT US | ©2004 UC REGENTS