The fifth spacecraft/probe arrived from Swales to UCB last Thursday and since then was checked out by itself and as side-by-side with the pre-integrated fifth instrument suite. Environmental Testing at JPL, starting June 29, and Launch Site processing in Florida, is starting in mid-August. A collage of the five spacecrafts is shown in this picture all in one room at SSL.
|